Many launch problems come down to timing: a review takes longer than you planned, a store asset is the wrong size, or Google won't let a new account publish yet. This checklist puts each task in the week it has to happen, with the App Store and Google Play side by side. Every limit links to Apple's or Google's own page, checked on 27 Oct 2026.
The four weeks at a glance
| When | Main tasks |
|---|---|
| 4 weeks out | Beta testing on both stores, pre-order or pre-registration, featuring nomination |
| 3 weeks out | Store listing text, screenshots, video, prices |
| 2 weeks out | Submit final builds for review with a manual release, press kit ready |
| 1 week out | Press outreach, launch posts drafted, codes planned |
| Launch day | Release in both stores, check the live listings, create codes, answer people |
Four weeks out: test and open the doors
By now the app should be feature complete. This week is about real people using it, and about letting people sign up before it exists.
App Store
- Put the build on TestFlight. Internal testers (up to 100 App Store Connect users) can start at once. External testers (up to 10,000) need the first build to pass a review.
- Decide on a pre-order. For a first release, the release date must be 2 to 180 days in the future, and the app must pass App Review first. Customers who pre-order a paid app pay on release day, and the app downloads to their device.
- Send a featuring nomination in App Store Connect. Apple asks for at least two weeks' notice and suggests up to three months for wider consideration.
Google Play
- Run internal testing (up to 100 testers) and a closed test. For new personal accounts the closed test is the 12 testers for 14 days rule above.
- Decide on pre-registration. A campaign can run for at most 90 days. Pre-registered users get a notification at launch, and eligible devices install the app automatically.
- Google recommends a test release before you start pre-registration, so the store has a build to check.
Pre-orders and pre-registration both give you a public store page to link to before launch day. That matters for a press kit and for any post you write before release. If you skip them, you will have no store link until the day you go live.
Three weeks out: store listings and prices
Write the listing text in a plain document first, then paste it into each console. The limits differ slightly, so check each field.
| Field | App Store | Google Play |
|---|---|---|
| App name | 30 characters | 30 characters |
| Second line | Subtitle, 30 characters | Short description, 80 characters |
| Description | 4,000 characters | 4,000 characters |
| Keywords | 100 bytes, not shown to users | No keyword field |
| Editable without an update | Promotional text, 170 characters | Whole store listing (goes through review) |
Then the images. Getting the sizes right the first time saves a resubmission.
App Store
- 1 to 10 screenshots per device size, in JPEG or PNG with no transparency. App Store Connect scales down from the largest size you upload.
- If your app runs on iPad, at least one 13-inch screenshot (for example 2064 x 2752 pixels).
- Screenshots must "show the app in use, and not merely the title art, login page, or splash screen" (App Review Guideline 2.3.3).
- A privacy policy URL and your app privacy details in App Store Connect. Both are needed to submit.
Google Play
- App icon: 512 x 512 pixels, 32-bit PNG.
- Feature graphic: 1024 x 500 pixels, JPEG or 24-bit PNG with no alpha.
- Up to 8 screenshots per device type. Google recommends at least four phone screenshots of at least 1080 pixels.
- Optional video as a public or unlisted YouTube link with ads turned off. Only the first 30 seconds autoplay.
- The Data safety form and a privacy policy link. Both are required, even if you collect no data.
Set prices this week too. On Google Play, an app that was offered for free can never be changed to paid, so decide before the first release. Apple and Google each turn one price into local prices for every country, in different ways. Our guide to app pricing by country walks through both consoles.
Two weeks out: submit for review
Submit both builds now, with a manual release. The stores review on their own schedule. With a manual release, you still pick the day the app goes live.
App Store
- Apple says it reviews at least 50% of submissions in under 24 hours and 90% in under 48 hours. Those are typical times, not promises.
- Choose to release the version manually. After approval it waits until you click to release it.
- Apple says over 40% of unresolved issues relate to Guideline 2.1, App Completeness: crashes, placeholder content and missing information. Add a demo account and notes for the reviewer.
- New builds must be made with Xcode 26 or later (since 28 Apr 2026).
Google Play
- Google says some accounts get extended reviews of up to seven days, or longer in exceptional cases.
- Turn on managed publishing. After approval you choose exactly when the changes go live.
- New apps must target Android 16 (API level 36) or higher (since 31 Aug 2026).
- Google counts review time from your last change, so avoid small edits while a review is pending.
If a review is rejected, you still have about ten days to fix it and resubmit. That buffer is why this step comes two weeks before launch.
Finish your press kit this week as well: icon, screenshots, a short and a long description, a facts sheet and a contact. The app press kit guide has a list and a short release template.
One week out: tell people
- Send your press kit to writers who cover apps like yours, with the launch date and a request to hold the story until then (an embargo).
- Draft every launch post now: your mailing list, your social accounts, the communities you already take part in. On launch day you will be busy answering people.
- If you plan a Product Hunt launch, schedule it now. Product Hunt lets you schedule up to one month ahead. See Product Hunt for mobile apps.
- Plan your codes. Decide how many free codes you will give out, to whom, and for what.
Codes for launch week
Free codes let writers, early supporters and your waitlist try the paid parts of your app. The two stores handle them differently.
On Google Play, you create promo codes in Play Console under Monetize with Play, then Promo codes. You get up to 500 codes per quarter across paid apps and one-time products, and up to 10,000 per quarter for each subscription. See Google Play promo codes for developers.
On the App Store, offer codes cover in-app purchases and subscriptions. For one-time and custom codes, the app must be Ready for Distribution and the in-app purchase approved, and new codes can take up to an hour to work. In practice that means you create them on launch day, not before. See Apple offer codes for developers.
Launch day
App Store
- Release the approved version in App Store Connect.
- Open the listing on a real device in a few countries you sell in, with the price showing. It can take a while to appear everywhere.
- Create your offer codes and test one yourself.
Google Play
- Publish the approved release from managed publishing.
- Open the listing in the Play Store app and on the web. Check the price and the screenshots.
- Test one promo code yourself before sending any.
- Post your drafted announcements, with links to each store.
- Answer every comment and email on the day. Early questions show you what the listing failed to explain.
- Watch crash reports in Xcode Organizer and Android vitals, and ship fixes quickly.
After launch
The first week is when you learn what people actually do with the app. Read support emails and private feedback, fix what breaks, and update the listing text if people keep asking the same question. On the App Store, promotional text changes without a new build. On Google Play, listing changes go through review, so batch them.
Questions people ask
How long before launch should I submit to the App Store?
Two weeks is a safe margin. Apple reviews most submissions within 48 hours, but a rejection and a resubmission can add days. With a manual release, an early approval costs you nothing.
Can I launch on both stores on the same day?
Yes, if both builds are approved before the date. Use a manual release on the App Store and managed publishing on Google Play, then release both on the day.
Should I use pre-orders or pre-registration?
Use them if you will talk about the app before launch. They give you a store link to share and notify people on release day. If nobody will hear about the app before launch, they add little.